Detalle del backtest

EA: ea-tokyofix-eurjpy-m5 / 0.3.0 / 0.3.0|20260911T071028Z
Operaciones
538
Factor de beneficio
2.16
DD máx. %
0.17
Ganancia neta
126.1
Operaciones al año
70
Periodo analizado (UTC)
2019-01-01 2026-09-05
Duración: 7.68 años
Símbolo / Temporalidad
EURJPY / PERIOD_M5
Modelado: Mixed · ticks reales en el 8% del periodo
evidence dentro de muestra ajustado sobre 2019-01-01 → 2026-09-05
Datos de la ejecución
Barras: 573,202 Ticks: 392,476,680
Nota del tester
pv 0.3.0 = pv 0.1.0 + Japanese holiday calendar (engine build 0.2.0, InpSkipJpHolidays=true): no banks, no fix, so JP holidays are skipped and a gotobi flow that lands on one rolls back to the previous business day, the same way weekends already did. 2019-2026; pv 0.1.0 on the same window: 542 / 2.21 / +$128 (trades / PF / net). About 30 holiday-day trades are replaced by ~30 rolled-back ones; the money is a wash (the holiday days had been carrying a few lucky outliers), the rule is now correct by construction. Headless run; generated ticks before 2026.
Todos los campos
Valores tal cual se registraron del informe de MT5 y de la carga de datos.
RowKey 0.3.0|20260911T071028Z
Versión del EA 0.3.0
Símbolo EURJPY
Temporalidad PERIOD_M5
Inicio del test (UTC) 2019-01-01
Fin del test (UTC) 2026-09-05
Operaciones totales 538
Factor de beneficio 2.16
Ganancia neta 126.1
DD máx. sobre balance % 0.17
DD máx. sobre capital % 0.22
Barras 573,202
Ticks 392,476,680
Calidad del modelado % 8.00
Nota del tester pv 0.3.0 = pv 0.1.0 + Japanese holiday calendar (engine build 0.2.0, InpSkipJpHolidays=true): no banks, no fix, so JP holidays are skipped and a gotobi flow that lands on one rolls back to the previous business day, the same way weekends already did. 2019-2026; pv 0.1.0 on the same window: 542 / 2.21 / +$128 (trades / PF / net). About 30 holiday-day trades are replaced by ~30 rolled-back ones; the money is a wash (the holiday days had been carrying a few lucky outliers), the rule is now correct by construction. Headless run; generated ticks before 2026.
Si la ejecución tiene pocas operaciones, el PF es poco fiable: compara varias ejecuciones antes de sacar conclusiones.